We recommend measuring the distance between your portable generator and the location where the GenerLink will be installed to decide how long you need your GenerLok cord to be. The GenerLink comes with a FREE 20-foot GenerLok cable, and you can upgrade to a longer length if you need it.

Do they make a 50 amp GenerLink?

GenerLink 50 amp « LCEC – Lee County Electric Cooperative.

How does a meter mounted transfer switch work?

After our serviceman installs the transfer switch between the meter and the meter base, the homeowner can plug in the power supply cable directly from the generator to the switch for use when service is disrupted. The switch enables electricity from the generator to power your home.

Does GenerLink require a floating neutral?

The generator must have a “Floating neutral” or “Neutral not connected to frame” or similar marking on the unit. 4. The generator must be operated outside, in a well-ventilated area away from doors, windows, air intakes, dryer vents or other sources of ingress.

What is the cost to install GenerLink?

The GenerLink system is available starting at a cost of $1,344 for a 30 AMP GenerLink with a 20′ Cord – cost will vary based on material costs and if an additional cord length is required. It is installed and maintained by EQUS for a monthly fee of $12.67, which covers maintenance and replacement costs.

Who can install GenerLink?

trained technicians
Installation of GenerLink™ must only be performed by properly trained technicians. Do not proceed with this installation unless you have been authorized by your local electric utility to do so.

Can you install GenerLink yourself?

Installation of GenerLink™ must only be performed by properly trained technicians. Do not proceed with this installation unless you have been authorized by your local electric utility to do so.

Can you test a GenerLink with utility power?

The GenerLink will not transfer to the generator during testing with utility power present. GenerLink will not continuously connect the generator to the loads or it periodically cycles the loads on and off.

How long does it take to install a GenerLink?

Installation can often take about two to three hours and may require re-wiring your home’s electric system. 2. With GenerLink, you have the flexibility of selecting the appliances you want to run from your home’s breaker panel, up to the capacity of your generator.

Who can install a GenerLink?