The first new nuclear power station to be built in the UK in over 20 years; Hinkley Point C in Somerset will provide low-carbon electricity for around 6 million homes, create thousands of jobs and bring lasting benefits to the UK economy.

Is Hinkley Point finished?

The start of electricity generation for unit 1 of the Hinkley Point C plant in the UK is now expected in June 2027 and the project completion costs are now estimated in the range of GBP25 to 26 billion (in 2015 prices), EDF has announced following a review.

Is China still involved in Hinkley Point?

Members of his Conservative Party have repeatedly expressed concern about China’s increasing involvement in critical aspects of U.K. infrastructure. CGN holds a stake in Hinkley Point C, due to start generating in 2026, and has a 20% share in the development phase of Sizewell C.

Is Hinkley Point nuclear?

Hinkley Point A nuclear power station is a Magnox nuclear power station undergoing decommissioning. It is located on a 19.4-hectare (48-acre) site in Somerset on the Bristol Channel coast, 5 miles (8 km) west of the River Parrett estuary.

Does the UK need nuclear?

We need both nuclear power and power from renewables, the long-term storage of which is a real problem. It is sad that the UK government’s abandonment of support for nuclear industry development in the 1990s has led to the import of expensive foreign reactors.

Which companies are working on Hinkley Point C?

Altrad, Balfour Beatty Bailey, Cavendish Nuclear and Doosan Babcock have joined forces to officially form the MEH Joint Venture to deliver the erection sequence for the Hinkley Point C nuclear power plant construction site in Somerset, England.

What would happen if Hinkley Point exploded?

If there was a nuclear incident at the plant, the nearby population would be told to stop consuming vegetables, milk and water within 24 hours, according to the report. Hinkley Point C in Bridgwater will be the first new nuclear power station built in the UK in more than 20 years.

Where does the UK get uranium from?

Highly enriched uranium In addition to domestic production, the United Kingdom received about 13 tons of uranium-235 in HEU from the United States.

What is the Hinkley Point C nuclear power plant?

The 3,260MW Hinkley Point C (HPC) nuclear power plant under construction in Somerset, South West England, UK, is the first new nuclear power facility to be built in the UK since 1995. It is also the first nuclear power station to be built in Europe since the 2011 Fukushima disaster in Japan.

What’s happening at Hinkley Point C?

At Hinkley Point C we’re building two new nuclear reactors, the first in a new generation of nuclear power stations in Britain providing zero-carbon electricity for around six million homes.

When will Hinkley Point B stop producing electricity?

Hinkley Point B began operation in 1976. It produces up to 965 megawatts of electricity. It will stop generating electricity in 2022. EDF’s company NNB Generation Company (HPC) Ltd is building a new, twin reactor nuclear power station (Hinkley Point C) at the site. It is expected to begin generating electricity in 2026.